                  Summer Plan for Aurora GUI Monitoring component


Objective:
    The purpose of the GUI monitoring component is to allow a user of the Aurora
    system to see any bottlenecks or overflows in the system. In order to
    achieve this, users will be given the option of several different view
    options, each dependant on the value to be measured. This data should be
    presented in a clear manner, possibly at the discretion of the user.

Method:
    There are several possibilities regarding what can be measured, and how to
    present this information to the user. The top candidates at present are as
    follows:
    (1) What to measure
        (a) Latency between time of arrival at an arc and departure time
        (b) Queue length on an arc
        (c) Rate at which data reaches or leaves an arc
        (d) Length of time it takes a tuple to be computed within a box
    (2) How to present system status
        (a) Color arcs
        (b) Text label on arc
        (c) Tooltip on mouseover
        (d) Width of the arrow
        (e) QoS graph on the end of the arc

Needs:
    (1) Retrieve data from C++
        (a) look into sleepycat
        (b) look into JNI
        (c) determine who's storing stats
    (2) Research Petal
        (a) for coloring arcs
        (b) for labeling arcs
        (c) for changing width of petal arcs
        (d) for adding tooltips
        (e) for adding graph labels to arcs
    (3) Java color
        (a) find out why color wasn't working
        (b) fix, and find an appropriate scheme
    (4) Decide on method
        (a) Primary method
        (b) determine which other methods to offer

Summer plan:
    June 14- Prelimnary research complete, weekly release schedule updated
    June 21- Method decision, first version of display component; Discussions
             with those responsible for storing data, research into method of
             said communication. work with workload gen (provide components)
    June 28- Next release of display (runtime change of values); design and 
             first release of communication, retrieving data from workload gen
    July 5- Communication improvements, work with workload gen on improvements
    July 12- First full integration of communication with display, runtime
             change of display, etc.
    July 19- Secondary methods of display, improvements to first full release
    July 26- ?
    August 2- ?
    August 9- ?
    August 16- ?
    August 30- Full release